Skip to content
U.S. DATA CENTER INTELLIGENCEProjects. Places. Evidence.
DATA CENTERRADAR●

TX / MARKET PREVIEW

Texas data center project tracker

94 published public records · tracked catalog, not a statewide total

Track Texas data center projects through public previews of locations, recorded stages and dated milestones. Use the construction view and city search below; detailed project research remains available with membership.

  • Planned 64
  • Operational 1
  • Under Construction 23
  • In Development 3
  • Site preparation 1
  • Partially operational 1
  • Expansion 1

BOUNDED REGIONAL REVIEW · OCTOBER 26, 2026

Which Texas projects deserve pursuit attention?

Start with the work your team can deliver, then separate operating phases, site preparation and building construction. The same city or developer can appear in records that call for different decisions.

Our sample and its limits

This selected review covers 3 named records from the 94 Texas public records currently displayed in Radar. Selection was fixed to three existing previews with direct company milestone sources, reopened October 26. Source dates run from September 30, 2025 to the July 27–28, 2026 dates displayed by Meta. This is a comparison of those published claims, not a current-status survey or a Texas project census. A targeted October 26 follow-up found the June 9 company update below; the stored project classifications are retained and are not present-day phase verification.

Selected public evidence and the next pursuit question
Public record / recorded stageDated source and supported milestoneBoundary and next check
Crusoe Stargate Abilene campusVID-0669 · Partially operationalSeptember 30, 2025 · company source

Crusoe reported the initial Abilene phase running workloads.

Initial operation does not establish completion of the whole campus.

Next check: Identify the remaining building or package before treating campus expansion as a pursuit.
Crusoe Abilene campus for MicrosoftVID-0746 · Site preparationMarch 27, 2026 · company source

Crusoe reported land clearing and site preparation at the separate Microsoft campus.

An energization target is a forecast; this is not the operating Stargate campus.

Next check: Confirm the named campus, present work package and purchasing route before assigning estimating time.
Meta El Paso data centerVID-0769 · Under ConstructionJuly 27–28, 2026 (both dates appear) · company source

Meta described the El Paso campus as under construction.

Construction reporting does not establish completed operations or an open bid.

Next check: Establish whether your package is still procurable and who is authorized to purchase it.

Later Abilene evidence: Crusoe’s June 9, 2026 update reports two flagship buildings operational, six under construction and a recent groundbreaking at the separate Microsoft campus. That supports separating buildings and campuses; it does not identify a currently available work package or establish today’s construction position.

What changes the shortlist

The selected set includes 1 site-preparation, 1 construction and 1 partially operational record. There is no announced-only or approved-only case in this selected set; that says nothing about the rest of Texas. Do not combine the two Abilene campuses or count initial operation as completion of every phase.

  • Research first: match the development to your service territory and exact work package.
  • Qualify next: obtain current phase, purchasing responsibility and invitation or prequalification evidence.
  • Hold estimating: a missing package or purchasing route remains a missing input, even when construction is reported.

These are Radar's pursuit-screening recommendations, not bid availability. Public record research-check dates remain unchanged; reopening a source for this analysis is a separate action.

Use the GC estimating gate · Build the BD next-conversation shortlist · Review member research and CSV export

Recently added projects

New public previews, ordered by first publication date where known.

Find Texas projects by stage and location

Choose the recorded construction stage, then search a city or public project name. A stage is a research lead; it does not establish an open bid, contractor award or available contract.

94 matching public records. Separate phases may have separate records.

Project previewLocationRecorded stageResearch & milestonesOpen project
Hut 8 Beacon Point AI campusVID-0786Member research availableNueces CountyTexasUnder ConstructionResearch check date: Oct 10, 2026Open
Meta El Paso data centerVID-0769Member research availableEl PasoTexasUnder ConstructionResearch check date: Oct 10, 2026Latest confirmed milestone: Oct 15, 2025Open
Crusoe Abilene campus for MicrosoftVID-0746Member research availableAbileneTexasSite preparationResearch check date: Oct 10, 2026Latest confirmed milestone: Mar 27, 2026Open
Crusoe Stargate Abilene campusVID-0669Member research availableAbileneTexasPartially operationalResearch check date: Oct 10, 2026Latest confirmed milestone: Sep 30, 2025Open
1606 Corp Lufkin Data Center (555 Sellers St)VID-0641Member research availableLufkinTexasPlannedResearch check date: Not recordedOpen
5CDC Dallas-Fort Worth - DFW01VID-0640Member research availableFort WorthTexasPlannedResearch check date: Not recordedOpen
Aligned DFW-03VID-0792Member research availableMansfieldTexasOperationalResearch check date: Not recordedOpen
Amazon AWS SAT - 12807 Donop BVID-0653Member research availableElmendorfTexasUnder ConstructionResearch check date: Not recordedOpen
Amazon AWS SAT - 1535 NW CrossroadsVID-0676Member research availableSan AntonioTexasPlannedResearch check date: Not recordedOpen
Amazon AWS SAT - TX-211 & Potranco RdVID-0677Member research availableSan AntonioTexasPlannedResearch check date: Not recordedOpen
Amp Energy East Texas (Project Lufkin)VID-0725Member research availableLufkinTexasPlannedResearch check date: Not recordedOpen
Archer: Dallas CampusVID-0727Member research availableDallasTexasPlannedResearch check date: Not recordedOpen
Barrio Energy - TylerVID-0728Member research availableTylerTexasUnder ConstructionResearch check date: Not recordedOpen
Black Mountain San AntonioVID-0730Member research availableSan AntonioTexasPlannedResearch check date: Not recordedOpen
Black Mountain: Forest HillVID-0731Member research availableTarrantTexasPlannedResearch check date: Not recordedOpen
Blueprint Georgetown DCVID-0732Member research availableGeorgetownTexasPlannedResearch check date: Not recordedOpen
Blueprint Projects: Taylor CityVID-0733Member research availableWilliamsonTexasPlannedResearch check date: Not recordedOpen
Circle T Data CenterVID-0787Member research availableWestlakeTexasIn DevelopmentResearch check date: Not recordedOpen
CleanArc Dallas Data CenterVID-0739Member research availableDallasTexasPlannedResearch check date: Not recordedOpen
CloudBurst Central TexasVID-0741Member research availableSan MarcosTexasUnder ConstructionResearch check date: Not recordedOpen
CloudBurst San Marcos Data CenterVID-0742Member research availableSan MarcosTexasPlannedResearch check date: Not recordedOpen
Crusoe Goodnight Campus (Project Llano)VID-0747Member research availableClaudeTexasUnder ConstructionResearch check date: Not recordedOpen
Crusoe Port of Victoria CampusVID-0748Member research availableVictoriaTexasPlannedResearch check date: Not recordedOpen
Crusoe SnyderVID-0749Member research availableHermleighTexasPlannedResearch check date: Not recordedOpen
CyrusOne Austin Data CenterVID-0752Member research availableAustinTexasPlannedResearch check date: Not recordedOpen
CyrusOne Castroville SAT14AVID-0756Member research availableCastrovilleTexasUnder ConstructionResearch check date: Not recordedOpen
CyrusOne Fort WorthVID-0755Member research availableFort WorthTexasPlannedResearch check date: Not recordedOpen
Danik Data CenterVID-0679Member research availableDallasTexasPlannedResearch check date: Not recordedOpen
DataBank Red Oak Campus (DFW9 - DFW16)VID-0757Member research availableRed OakTexasUnder ConstructionResearch check date: Not recordedOpen
Digital Commerce Park OneVID-0734Member research availableEllisTexasPlannedResearch check date: Not recordedOpen
Duos Edge Al - AmarilloVID-0761Member research availableAmarilloTexasPlannedResearch check date: Not recordedOpen
Duos Edge Al - PampaVID-0762Member research availablePampaTexasPlannedResearch check date: Not recordedOpen
EdgeConneX AUSO2VID-0764Member research availableBastropTexasPlannedResearch check date: Not recordedOpen
EdgeConnex LancasterVID-0766Member research availableLancasterTexasPlannedResearch check date: Not recordedOpen
Edged AustinVID-0767Member research availableMartindaleTexasPlannedResearch check date: Not recordedOpen
Eneus Energy - HarlingenVID-0771Member research availableHarlingenTexasPlannedResearch check date: Not recordedOpen
Equinix DA11 Phase 4VID-0791Member research availableDallasTexasExpansionResearch check date: Not recordedOpen
Equinix DA12 CampusVID-0772Member research availableDallasTexasPlannedResearch check date: Not recordedOpen
Flexential Dallas-TaltyVID-0774Member research availableForneyTexasPlannedResearch check date: Not recordedOpen
Google Haskell County CampusVID-0781Member research availableHaskellTexasUnder ConstructionResearch check date: Not recordedOpen
Google Midlothian Building 5VID-0780Member research availableMidlothianTexasUnder ConstructionResearch check date: Not recordedOpen
GW RanchVID-0680Member research availablePecosTexasPlannedResearch check date: Not recordedOpen
IREN Sweetwater 1VID-0650Member research availableSweetwaterTexasUnder ConstructionResearch check date: Not recordedOpen
Irving Data CenterVID-0682Member research availableDallasTexasPlannedResearch check date: Not recordedOpen
Jarvis Media Group: Montgomery Data CenterVID-0683Member research availableConroeTexasPlannedResearch check date: Not recordedOpen
Meta Temple Data CenterVID-0656Member research availableTempleTexasUnder ConstructionResearch check date: Not recordedOpen
Microsoft Wiseman Boulevard (SAT14)VID-0658Member research availableSan AntonioTexasUnder ConstructionResearch check date: Not recordedOpen
Oppidan SMW Data CenterVID-0686Member research availableEl PasoTexasPlannedResearch check date: Not recordedOpen
PowerCampus AustinVID-0687Member research availableHuttoTexasPlannedResearch check date: Not recordedOpen
Prime AustinVID-0689Member research availableMaxwellTexasPlannedResearch check date: Not recordedOpen
Prime Dallas 2VID-0659Member research availableDallasTexasUnder ConstructionResearch check date: Not recordedOpen
Project Comal CampusVID-0693Member research availableTaylorTexasPlannedResearch check date: Not recordedOpen
Project Dorothy 3VID-0694Member research availableSilvertonTexasPlannedResearch check date: Not recordedOpen
Project HuttoVID-0697Member research availableHuttoTexasPlannedResearch check date: Not recordedOpen
Project MerlinVID-0779Member research availableMcGregorTexasPlannedResearch check date: Not recordedOpen
Project OrangeVID-0699Member research availableLancasterTexasPlannedResearch check date: Not recordedOpen
Project RaptorVID-0744Member research availableTravisTexasPlannedResearch check date: Not recordedOpen
Project Zeus / Red OakVID-0794Member research availableRed OakTexasUnder ConstructionResearch check date: Not recordedOpen
Prometheus TX-1VID-0700Member research availableTerrellTexasPlannedResearch check date: Not recordedOpen
Prominent Jarell Data CenterVID-0701Member research availableWilliamsonTexasPlannedResearch check date: Not recordedOpen
QTS Howard CountyVID-0789Member research availableBig SpringTexasPlannedResearch check date: Not recordedOpen
QTS South DallasVID-0703Member research availableWilmerTexasPlannedResearch check date: Not recordedOpen
QumulusAI DentonVID-0704Member research availableDentonTexasPlannedResearch check date: Not recordedOpen
Rackspace DallasVID-0705Member research availableGrapevineTexasPlannedResearch check date: Not recordedOpen
Rowan CincoVID-0660Member research availableLytleTexasUnder ConstructionResearch check date: Not recordedOpen
Rowan Digital Project TempleVID-0661Member research availableTempleTexasUnder ConstructionResearch check date: Not recordedOpen
Rowan Temple CampusVID-0799Member research availableTempleTexasUnder ConstructionResearch check date: Not recordedOpen
SDC San MarcosVID-0708Member research availableSan MarcosTexasPlannedResearch check date: Not recordedOpen
Serverfarm CTX1 MansfieldVID-0793Member research availableHoustonTexasUnder ConstructionResearch check date: Not recordedOpen
Skybox Data Center Round RockVID-0709Member research availableRound RockTexasPlannedResearch check date: Not recordedOpen
Skybox Legacy CampusVID-0663Member research availablePlanoTexasUnder ConstructionResearch check date: Not recordedOpen
Skybox PowerCampus DallasVID-0664Member research availableLancasterTexasUnder ConstructionResearch check date: Not recordedOpen
Skybox PowerCampus TexasVID-0710Member research availableWichita FallsTexasPlannedResearch check date: Not recordedOpen
Skybox San AngeloVID-0711Member research availableSan AngeloTexasPlannedResearch check date: Not recordedOpen
STACK Infrastructure DFW01CVID-0712Member research availablePlanoTexasPlannedResearch check date: Not recordedOpen
Stack Infrastructure DFW02VID-0713Member research availableDallasTexasPlannedResearch check date: Not recordedOpen
Stream Data Center: Wilmer Il Hyperscale Campus (DFW C)VID-0714Member research availableWilmerTexasPlannedResearch check date: Not recordedOpen
Switch THE ROCK CampusVID-0759Member research availableRound RockTexasPlannedResearch check date: Not recordedOpen
TeraWulf Abernathy CampusVID-0715Member research availableAbernathyTexasPlannedResearch check date: Not recordedOpen
Tract AustinVID-0717Member research availableCaldwellTexasPlannedResearch check date: Not recordedOpen
Tract Caldwell CountyVID-0718Member research availableLockhartTexasPlannedResearch check date: Not recordedOpen
Vantage TX11 - San AntonioVID-0670Member research availableSan AntonioTexasUnder ConstructionResearch check date: Not recordedOpen
Vantage TX12 - San AntonioVID-0720Member research availableSan AntonioTexasPlannedResearch check date: Not recordedOpen
Wowrack DallasVID-0721Member research availableDallasTexasPlannedResearch check date: Not recordedOpen
Yondr LancasterVID-0722Member research availableLancasterTexasPlannedResearch check date: Not recordedOpen
Chevron Data Center Power ProjectVID-0735Member research availableCity not recordedTexasPlannedResearch check date: Not recordedOpen
CleanSpark Houston Data CenterVID-0740Member research availableCity not recordedTexasPlannedResearch check date: Not recordedOpen
Data CityVID-0770Member research availableCity not recordedTexasPlannedResearch check date: Not recordedOpen
Energy Ranch Data CenterVID-0784Member research availableCity not recordedTexasPlannedResearch check date: Not recordedOpen
Google Armstrong County Data CenterVID-0796Member research availableCity not recordedTexasIn DevelopmentResearch check date: Not recordedOpen
Google Wilbarger County Data CenterVID-0795Member research availableCity not recordedTexasIn DevelopmentResearch check date: Not recordedOpen
Project HorizonVID-0696Member research availableCity not recordedTexasPlannedResearch check date: Not recordedOpen
Prometheus Pecos ProjectVID-0797Member research availableCity not recordedTexasPlannedResearch check date: Not recordedOpen
Soluna Project Kati 2VID-0665Member research availableCity not recordedTexasUnder ConstructionResearch check date: Not recordedOpen
Public fields appear where source-supported and eligible. Explore available contractor details, exact reported specifications, capacity evidence, supporting history and tracker CSV export with Radar membership.

What these public records establish

Keep separate campuses and building phases distinct. Reported site power, planned compute capacity and current delivered IT load are different claims.

94 published public records on this page; 94 include the current field-level source report. Other previews retain their narrower published scope. These counts are records in Radar, not unique campuses, statewide totals or active bids.

Use the recorded-stage filters to choose a lead, then match a dated decision to its exact site, phase, authority and conditions. Check later amendments, withdrawals and restrictions. Missing public fields remain unknown; membership does not turn an uncertain claim into a verified fact.

Record the decision and unresolved questions · Check company roles and official research routes · Identify the purchasing route

Separate campuses and phases may have separate records. Counts describe our research coverage, not statewide industry totals.

FREE NATIONAL DIGEST

Follow U.S. data center development.

Get selected public project previews and practical research guidance from across the U.S. Sent when there are new previews to share, at most once a week. State-filtered email delivery is not currently available.

Get the free national digest →

Free to subscribe. Confirm your email to join.
Unsubscribe anytime.

TAKE THE NEXT STEP

Turn research into your next conversation.

Explore the member tracker for deeper project details, supporting documents, and newly reported developments.

Explore membership