PROJECT PREVIEW
NTT Global Data Centers Chicago CH4, Itasca
Site preparationThe record reports site preparation; this view does not establish the current stage of CH1/CH2.
Itasca, Illinois · Research check date: Oct 10, 2026
Reported project facts
Reported; not independently confirmed by Radar. Source date, retrieval date and public-source check date: Not recorded.
- Reported developer / operator
- NTT Global Data Centers
- Location
- Itasca, DuPage County, Illinois
- Recorded stage
- Site preparation
This is the reported stage in the retained source material, not a new confirmation of present conditions. A proposal, permission, construction phase and operating milestone are different claims. Check later decisions, withdrawals and changes before acting.
Public supporting source (datacentermap.com) ↗
“Retrieved by Radar” is when we obtained the source for this review. “Public-source check date” applies only to the facts cited here. Neither date means the project itself changed or independently verifies every field.
Member research: available contractors and engineers, exact reported values and capacity evidence, detailed sources and permitting history, plus tracker CSV export. Availability and verification vary by record.
Sources checked; no additional precisely dated milestone was established in the reviewed sources. A check does not independently verify every field.
Browse data center projects in Illinois · What does this recorded stage mean?
Campus and phase scope
CH3, CH4 and CH5 have separate record stages. This view does not establish the current stage of CH1/CH2.
| Building / phase | Recorded stage | Evidence scope |
|---|---|---|
| CH3 | Under Construction | April 2026 village FAQSource checked: 2026-10-10Public source ↗ |
| CH4 | Site preparation | April 2026 village FAQSource checked: 2026-10-10Major construction expected in 2027 is a forecast.Public source ↗ |
| CH5 | Stage under review | April 2026 village FAQSource checked: 2026-10-10Site-plan outcome unresolved; anticipated 2028 construction is conditional.Public source ↗ |
Phase entries describe evidence at different scopes. They are not added to campus totals.
Research check dates describe the record’s research history. Public-source check dates apply only to the cited facts. Neither date confirms a project change or verifies every field. Project milestones are tracked separately. Recorded stage is a snapshot, not a guarantee of completion. How we research.
Related public projects
Other public records in Illinois or associated with the same reported company.
- NTT Global Data Centers Chicago CH5, ItascaItasca · IllinoisRecorded stage: Stage under review
- NTT Global Data Centers Chicago CH3, ItascaItasca · IllinoisRecorded stage: Under Construction
- Aligned ORD-04, Elk Grove VillageElk Grove Village · IllinoisRecorded stage: Stage under review
- Related Digital Chicago data center at 8080 SChicago · IllinoisRecorded stage: Planned
- HydraVault Data Center, South Loop ChicagoChicago (South Loop) · IllinoisRecorded stage: Under Construction